7 Wastes Of Lean Sign
Item #
L1018-BB
Sign Reads
7 Wastes Of Lean Maximize Efficiency By Reducing Or Eliminating These Wastes Of Lean Manufacturing. Defects Waiting Time Extra Motion Excess Inventory Transportation Over Production Over Processing

7 Wastes Of Lean Sign

Size:

Material:

Laminate:

Mounting:

Packaging:

Price:
$9.36
Low Price Guarantee
Qty
Each
  • 1–2
    $9.36
  • 3–4
    $8.85
  • 5–9
    $8.58
  • 10–19
    $8.07
  • 20–39
    $7.54
  • 40+
    $6.77

Your item has been added to cart.

0 In Stock
Special freight arrangements are necessary.

Need a quote for a large order? Call 973‑405‑2672.

Recommended Accessories

Product Information

Details

Our 7 Wastes Of Lean Sign educates your team on the seven common types of waste found in lean operations, helping you drive operational efficiency. Constructed for maximum durability, this sign is designed to stand up to tough conditions, ensuring that it remains an effective part of your lean workspace for years to come.

Typical 5S Color Standards:

  • 5S Details Handlebars

Reviews

800‑274‑5271
Cart

Your cart is empty.