- Item #
- C4188-AB
- Label Reads
-
Lock-Out Procedures 1. Identify the types of energy sources used, potential hazards and all control devices. 2. Notify all affected employees. 3. Turn off all operating controls. 4. Locate all energy sources. 5. Isolate all energy sources by blocking, bleeding and venting stored energy as found in springs. (Hydraulic and Pneumatic Systems) 6. Lock-out all switches and energy controls in the "OFF" or "SAFE" position. 7. Make sure everyone is clear, and test operating controls to insure power has been secured and the controls cannot start the machine. 8. Return all operating controls to the "OFF" POSITION. 9. Perform required task. 10. Remove lock out devices only after the equipment is fully assembled and all affected employees have been notified. Each lock-out device must be removed by the person who put it on.
- Language
- English. Also available in Bilingual (English/Spanish).
- Compliance
-
- LEED Compliant
- ECCN Certification