Scaffolding Safe For Use Do Not Alter Tag
Item #
E1516
Tag Reads
Tag Front Reads: Scaffold #_______ Scaffolding Identification Tag Date Erected:_______ Expected Removal Date:_______ Job Number:_______ I Have Inspected And Approved The Scaffold Built And Consider It To Be Safe And Adequate For Completion Of The Work Specified. Inspected By:_______ Date:_______ Reinspected Name:_____, Date:_____ Modification Date Name:_______, Date:_______ / Back Reads: Scaffolding Identification Tag Erected By:_______ Safe For Use Do Not Alter Do Not Overload
Tag Design
Withstands Pull Force of 50 lb.

Scaffolding Safe For Use Do Not Alter Tag

Double-Sided

Size:

Material:

Laminate:

Mounting:

Packaging:

Price:
$12.50
Low Price Guarantee
Pkgs
Each
Per Tag
  • 1–5
    $12.50
    ($2.50/ea)
  • 6–10
    $11.90
    ($2.38/ea)
  • 11+
    $10.45
    ($2.09/ea)
0 In Stock
Special freight arrangements are necessary.

Need a quote for a large order? Call 800‑274‑5271 or email us.

Product Information

Details

Scaffold Tags

To view and print a PDF version of this page, click on this link: SafetySign.com Scaffold Tags PDF →

To Learn about the Materials used in the making of this sign, refer to the Tab called "Material Descriptions..."

Tag Construction

Material Thickness
4 x 5-1/2” 15 mil Matte Vinyl.
3-1/4 x 5-5/8” 15 mil Matte Vinyl.
Description
Durable 15 mil write on vinyl which is ideal for every day use throughout any facility.
Outdoor Durability
2 - 3 years.
Attachment
4 x 5-1/2” Tag: 7/32" ID Brass Grommet and 6” nylon ties (sold in packages of 5 tags & 5 nylon ties).
3-1/4 x 5-5/8” Tags: 3/8" ID Brass Grommet and 6” nylon ties (sold in packages of 5 tags & 5 nylon ties).
Service Temperature
0°F - 150°F.

Scaffold Tagging & Inspection:

The most effective means of communication between the scaffold builder and the scaffold user is a scaffold tag.
The following guidelines will assist you in developing an appropriate tagging system:

  • Inspection and tagging of the scaffold is to be performed by a competent worker experienced in the erection of scaffolds.
  • A unique scaffold identification tag number must be clearly identified on all tags for tracking purposes.
  • All scaffolds shall be inspected after erection as per OSHA requirements.
  • All scaffold identification tags will be of solid green, yellow, or red color with black lettering.
  • Green Tags will be hung on scaffolds that have been inspected and are safe for use.
  • Yellow “CAUTION” tags are used whenever the scaffold has been modified to meet work requirements, and as a result could present a hazard to the user, this tag also informs the user of any fall requirements devices that may be needed.
  • Red “DANGER - DO NOT USE” tags will used during erection or dismantling when the scaffold is left unattended and replace all green and yellow tags in the event a scaffold has been deemed unfit for use.

Scaffold Tags 4 x 5-1/2"

  • Scaffold Safety Tags

Scaffold Tags 3-1/4 x 5-5/8"

  • Scaffold Safety Tags

Reviews

800‑274‑5271
Cart

Your cart is empty.